Form 8-K
CHESAPEAKE UTILITIES CORP 734-6799 false 0000019745 0000019745 2019-12-12 2019-12-12

 

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

WASHINGTON, D.C. 20549

 

FORM 8-K

 

CURRENT REPORT

Pursuant to Section 13 or 15(d)

of the Securities Exchange Act of 1934

Date of Report (Date of Earliest Event Reported): December 12, 2019

 

Chesapeake Utilities Corporation

(Exact name of registrant as specified in its charter)

 

Delaware

 

001-11590

 

51-0064146

(State or other jurisdiction

of incorporation)

 

(Commission

File Number)

 

(I.R.S. Employer

Identification No.)

909 Silver Lake Boulevard, Dover, Delaware

 

19904

(Address of principal executive offices)

 

(Zip Code)

Registrant’s telephone number, including area code: 302. 734.6799

Not Applicable

Former name or former address, if changed since last report

 

Securities registered pursuant to Section 12(b) of the Act:

Title of each class

 

Trading

Symbol(s)

 

Name of each exchange

on which registered

Common Stock - par value per share $0.4867

 

CPK

 

New York Stock Exchange

Check the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions:

Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)

Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)

Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))

Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))

Indicate by check mark whether the registrant is an emerging growth company as defined in Rule 405 of the Securities Act of 1933 (§230.405 of this chapter) or Rule 12b-2 of the Securities Exchange Act of 1934 (§240.12b-2 of this chapter).

Emerging growth company  

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act.  

 

 


Item 7.01 Regulation FD Disclosure.

On December 12, 2019, management from Chesapeake Utilities Corporation (the “Company”) will meet with investors, analysts, and other members of the financial community during the Wells Fargo 18th Annual Midstream and Utility Symposium in New York City. The Company’s investor presentation includes certain forward-looking information. A copy of this investor presentation material is attached to this Current Report on Form 8-K (this “Report”) as Exhibit 99.1. The investor presentation material is also available in the “Investors” section of the Company’s website, sub-section “Events and Presentations” (www.chpk.com).

The information contained in this Item 7.01 and in Exhibit 99.1 attached to this Report is being furnished and shall not be deemed filed for purposes of Section 18 of the Securities Exchange Act of 1934, as amended, or otherwise subject to the liabilities of such section. Furthermore, such information shall not be deemed to be incorporated by reference into any registration statement or other document filed pursuant to the Securities Act of 1933, as amended.

Item 9.01 Financial Statements and Exhibits.

Exhibit

Numbers

   

Description

         
 

99.1

   

Wells Fargo 18th Annual Midstream and Utility Symposium Presentation

         
 

104

   

Cover Page Interactive Data File (formatted as inline XBRL and contained in Exhibit 101)


SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.

 

 

Chesapeake Utilities Corporation

             

December 12, 2019

 

 

By:

 

/s/ Beth W. Cooper

 

 

Name:

 

Beth W. Cooper

 

 

Title:

 

Executive Vice President and Chief Financial Officer

EX-99.1

Slide 1

18th Annual Wells Fargo Midstream and Utility Symposium New York, NY December 12, 2019 Exhibit 99.1


Slide 2

Forward Looking Statements and Other Disclosures Safe Harbor Statement: Some of the Statements in this document concerning future Company performance will be forward-looking within the meanings of the securities laws. Actual results may materially differ from those discussed in these forward-looking statements, and you should refer to the additional information contained in Chesapeake Utilities Corporation’s 2018 Annual Report on Form 10-K filed with the SEC and our other SEC filings concerning factors that could cause those results to be different than contemplated in today’s discussion. REG G Disclosure: Today’s discussion includes certain non-GAAP financial measures as defined under SEC Regulation G. Although non-GAAP measures are not intended to replace the GAAP measures for evaluation of Chesapeake’s performance, Chesapeake believes that the portions of the presentation, which include certain non-GAAP financial measures, provide a helpful comparison for an investor’s evaluation purposes. Gross Margin (non-GAAP measure): Gross Margin is determined by deducting the cost of sales from operating revenue. Cost of sales includes the purchased fuel cost for natural gas, electric and propane distribution operations and the cost of labor spent on different revenue-producing activities and excludes depreciation, amortization and accretion. Other companies may calculate gross margin in a different manner. Adjusted EPS (non-GAAP measure): Diluted Earnings per share excluding the impact of certain significant new non-cash items, including, but not limited to, the following: the impact of unrealized mark-to-market changes and one-time charges, such as severance charges. The Company calculates "adjusted earnings” by adjusting reported (GAAP) earnings to exclude the impact of certain significant non-cash items, including the impact of unrealized MTM gains (losses), one-time charges such as severance charges, and any prior year tax savings retained by our regulated businesses as a result of current year regulatory authorizations.


Slide 3

Business Overview 3


Slide 4

Business Overview Diversified Energy Delivery Business Natural Gas Distribution Delaware, Maryland, Florida Electric Distribution Florida Propane Distribution and AutoGas Delaware, Maryland, Pennsylvania, Virginia, Florida Natural Gas Transmission Delaware, Maryland, Pennsylvania, Florida Mobile CNG Temporary Services and Combined Heat & Power Florida and Southeastern United States Regulated Energy Unregulated Energy 84%* 16%* * % of LTM Operating Income as of 9/30/2019 Natural Gas Transportation Ohio States Marlin Gas has Served 4


Slide 1

Long-term Earnings Track Record Positioned for Growth and Total Return 5 $4.20 $4.55 ¹ 2017 GAAP $3.55; Adjusted $2.89; ² 2018 GAAP $3.45; Adjusted $3.31 Outlook for earnings growth within the range of previous guidance remains strong Commitment to achieve the target range is demonstrated by our long-term track record of delivering superior growth Expansion projects, organic growth and regulatory and efficiency initiatives will continue to drive increased earnings We will continue to pursue accretive, related opportunities like Marlin, Aspire and Eight Flags


Slide 6

Dividend Increased 9.5% in May 2019 Superior Dividend Growth with Retention to Support Future Earnings and Dividend Growth CPK’s one-year and five-year dividend growth of 9.5% and 8.4%, respectively, leads our peer group. Strong EPS Growth drives Dividend Growth and Dividend payout allows for reinvesting in future growth. Peers 6


Slide 7

Eastern Shore Natural Gas Transmission Pipeline Infrastructure KEY FACTS Description FERC regulated interstate natural gas transmission system operating under long-term firm contracts Miles of Pipeline 486 Delivery Points 96 Delivery Points within 16 Delivery Point Areas Compression 17,745 hp at 3 sites Daleville, PA 4 units, totaling 6,880 hp Delaware City, DE 6 units totaling 7,890 hp Bridgeville, DE 3 units totaling 2,975 hp Interconnects 4 Interconnects with 3 Upstream Pipelines Honey Brook, PA Texas Eastern Transmission Parkesburg, PA & Hockessin, DE Transcontinental Gas Pipeline Co. Daleville, PA Columbia Gas Transmission, LLC Eastern Shore Natural Gas Eastern Shore Natural Gas’ largest project to date completed this year


Slide 8

Natural Gas Distribution Delaware, Maryland, and Florida Growth is Strong KEY FACTS Natural Gas Customers > 158,000 customers Physical System > 4,300 miles of distribution mains 2018 Volume (Dts) > 48,000,000 Gas Supply Eastern Shore Columbia Gas Transco Texas Eastern Gulfstream FGT Peninsula Pipeline Peoples Gas FLORIDA NATURAL GAS DISTRIBUTION CHESAPEAKE UTILITIES & SANDPIPER


Slide 9

Florida Business Unit Profile Opportunities for Pipeline Growth Throughout the State 9 Northwest Florida In-Service Q2 - 2018 New Smyrna Beach In-Service Q2 - 2018 Western Palm Peach County In-Service Q4 – 2018 to Q1 - 2020 Callahan Pipeline – Nassau County In-Service Q3 - 2020 Florida Pipeline Expansions $117 Million Investment $18.6 Million Annual Margin Auburndale, Polk County In-Service Q3 - 2019


Slide 10

Continuing to Build for the Future Organic Growth Opportunities, Supplemented with Targeted Acquisitions Five-Year Cap Ex Plan In Millions Historical Cap Ex & Acquisitions In Millions Our 5-year CapEx plan includes $750 million to $1 billion of capital expenditures, predominantly into our utility & pipeline businesses 2019E: $170mm to $185mm 2018: $283mm 2020 – 2022E: $297mm to $532mm $750 million - $1 billion On Track To Achieve Investment Forecast


Slide 11

Florida Public Utilities - Electric Distribution Serving Northwest and Northeast Florida with Electricity KEY FACTS Florida Electric Customers > 32,000 customers Physical System ~905 miles of electric distribution line ~16 miles of electric transmission line 2018 Volume (Kwh) > 632,500 Electric Supply Gulf Power Company FPL Eight Flags Rayonier WestRock Company FLORIDA ELECTRIC DISTRIBUTION


Slide 12

Florida Energy Delivery Leveraging Our Core Competencies MARLIN GAS SERVICES Growth Forecast and Ongoing Initiatives Trailers and compressors on order Offload regulators under construction Further territorial expansion in Southeast, Mid-Atlantic, and Gulf Coast 2 additional planned CNG stations Probable expansion into LNG and RNG transport Financial Results / Forecast Est. ’19 Gross Margin ($mm) $3.4mm YTD ($5.4 mm expected FY) Est. ‘20 Gross Margin ($mm) Increased from $6.0mm to $6.3mm Mobile Compressed Natural Gas Delivery Solutions Acquired long-time supplier to Chesapeake in December 2018 Nationwide operator of fleet of 36 CNG tube trailers, as well as mobile compressors and patented offload regulators with capacity to transport over 7 billion cubic feet of natural gas annually Provides emergency response for pipeline and gas distribution systems, gas supply support during planned interruptions of service, and is considering both LNG and RNG/biogas logistics Since December acquisition, estimated annual gross margin for Marlin gas Services for 2019 and 2020 has increased in each quarterly report Marlin Gas Transport Combined Heat and Power Plant Combined heat and power (CHP) plant located on Amelia Island, FL Powered by natural gas transported by Peninsula Pipeline and Florida natural gas pipeline operation Produces 21 MWh of electricity and 75,000 pounds of steam per hour Sells generated electricity to Florida electric distribution operation, and sells steam to customer that owns the site location of the plant, (Rayonier Performance Fibers, LLC), both under separate 20-year contracts Eight Flags EIGHT FLAGS COPMBINED HEAT & POWER


Slide 13

Aspire Energy of Ohio Natural Gas Transmission ASPIRE ENERGY OF OHIO KEY FACTS Description Gathering, processing, and wholesale delivery of local natural gas to local utilities under long-term supply agreements Miles of Pipeline 2,700 Major Customers Columbia Gas of Ohio (NiSource) Consumers Gas Cooperative


Slide 1

Sharp Propane and AutoGas Leveraging Our Core Competencies to Provide New Offerings 14 KEY FACTS Description Delivery of propane to residential, commercial, industrial, wholesale and AutoGas customers Customers ~66,000 (Mid-Atlantic and Florida) Platforms Sharp Energy, Sharpgas, FPU, and Flo-gas Fueling Stations Network of 48 propane stations PROPANE DELMARVA PROPANE FLORIDA


Slide 15

Key Projects Driving Growth 15


Slide 16

Elkton Gas Company Strategic Acquisition for Delmarva Natural Gas Executing on Our Strategy: On December 5, 2019, Chesapeake Utilities and South Jersey Industries entered into an agreement under which Chesapeake will acquire Elkton Gas Company The transaction is expected to close in the first half of 2020, subject to receiving approval from the Maryland Public Service Commission The company was founded in 1863 as Elkton Gas Light Company Elkton Gas serves approximately 7,000 customers in Elkton, Maryland within a franchised area of Cecil County, Maryland Its territory is contiguous to Chesapeake’s franchised service territory in Cecil County, Maryland Elkton Gas has been a customer of Chesapeake’s interstate transmission pipeline subsidiary, Eastern Shore Natural Gas, since 1959 when natural gas first became available to serve the town of Elkton Elkton Gas will continue to operate out of its existing office with the same local personnel


Slide 17

Elkton Gas Company Strategic Fit Elkton Gas gives CPK an operational platform in Cecil County including personnel, a contractor pool and an operations center which will enable Chesapeake to more quickly expand our footprint in Cecil County Additional growth is expected in the area, due to its proximity to I-95 and the potential for a new interchange which is expected to spur additional commercial and industrial development A new 623 acre mixed use development has been proposed that would potentially add 4,289,000 sq. ft. of industrial/warehouse space, 257,600 sq. ft. of commercial/retail space and 1,205 homes Access to I-95 also provides potential opportunities for Marlin to expand its CNG and LNG business The acquisition will provide access to additional upstream capacity resources


Slide 18

Delmarva Natural Gas Distribution Organic Growth and Expansion Across the Peninsula 1 1 2 3 3 2 2 Legacy Organic growth focused on Kent and New Castle Counties, DE Present Growth into eastern Sussex County, DE and Cecil County, MD Conversion of existing propane customers in Worcester County, MD Future Continued expansion in growth areas of our service territory Looking for expansion opportunities in other areas of the Peninsula Elkton Gas


Slide 19

Del-Mar Energy Pathway Project Under Development Strategic Growth Initiative 19 Provides additional natural gas transmission pipeline infrastructure in Eastern Sussex County, Delaware and expands service into Somerset County, Maryland; serves four large anchor customers Estimated Project Cost: $ 37 MM Estimated In Service Date: Beginning of fourth quarter 2021* Estimated Annual Gross Margin: 2019- $ 0.7 MM 2020- $ 3.0 MM 2021- $ 4.1 MM 2022 forward - $ 5.1 MM Interim service in advance of this project generated $200,000 and $500,000 gross margin for the three months and nine months ended September 30, 2019, respectively. *Contingent upon FERC issuing authorization for the project by the fourth quarter of 2019.


Slide 20

West Palm Beach Expansion Enhances Reliability and Provides Additional Customer Growth 20 $5.2MM annual margin $2.3MM in 2019 $30MM total capital invested Q4 - 2018 initial service; fully in-service Q1 - 2020 Four PPC projects to serve FPU’s natural gas distribution systems expansions in Palm Beach County. Resolves a pipeline capacity constraint. Projects /Phases include Belvedere, Westlake/Arden, Avenir and Research Park - Marlin Gas is providing temporary service for customers ahead of the project schedule


Slide 21

Callahan Pipeline Nassau County, Florida 21 Peninsula Pipeline announced in May 2019 plans to construct a jointly owned 26 mile pipeline serving Nassau and Duval counties in Florida; Project will be jointly owned and built with Seacoast Gas Transmission (affiliate of Emera) Estimated Project Cost: $ 32.5 Million* Estimated In Service Date: Third Quarter of 2020 Estimated Annual Gross Margin: 2020- $ 3.2 million 2021 forward - $ 6.0 million 15 Miles of pipe constructed already and project is on schedule *Total project cost is estimated at $65 million – Chesapeake and Seacoast will fund 50% each.


Slide 22

Aspire Energy – Natural Gas Pipeline Project Guernsey Power Station In December 2017, Aspire executed a binding precedent agreement with Guernsey Power Station, LLC (GPS) providing for the relocation of an existing 6” steel Aspire pipeline (completed March 2018). Aspire received the exclusive rights to provide natural gas transportation services for a ten year (300,000 Dths per day for a proposed 1,650 MW power plant). GPS obtained financing in Q3 2019, after which Aspire will begin design and construction of interconnect facilities between the Tallgrass Energy Partners Rockies Express Pipeline (REX) and GPS. GPS is expected to be in service by late 2021. Capital Expenditures$5.5MM Margin$1.4MM 22


Slide 23

Sharp Energy Propane Business Growth Initiatives Maintain and develop residential builder relationships via dedicated staff to capitalize on new development opportunities and for seamless implementation These relationships are translating into new CGS in non-core markets AutoGas Fueling Stations Strategic partners have been key AutoGas technical services team is very capable Created a multi-fleet fueling station network to support refueling efficiency for our customers Start-ups and Acquisitions Facilitates geographic expansion beyond existing service territories Recent start-up in new Virginia market 2018 Ohl Acquisition December 2018 Poultry Production Producers are increasing capacity on the Delmarva Peninsula Sharp has superior infrastructure and strong grower relations Residential Community Gas Systems 25 23 Ohl Acquisition December 2018


Slide 24

Marlin Gas Services – Engine for Growth and Customer Service Exceeding Initial Margin Projections Year-to-Date Financial Performance Marlin generated $3.4 million of gross margin and $1.4 million in operating income during the first half of 2019. Based on results to date and the outlook going forward, we increased our gross margin estimates for Marlin to approximately $5.4 million in 2019 and $6.3 million in 2020. 24 In thousands Since the December acquisition, our estimated annual gross margin for Marlin Gas Services for 2019 and 2020 has increased in each quarterly report. * Estimate not provided in December quarterly report for 2020.


Slide 25

Financial Update 25


Slide 26

Continued Strong Performance Success in 2019 and Exciting Future Outlook Operations Significant gross margin growth for the quarter and year-to-date. Margins are driving strong operating income and EPS growth Financial New projects Several new projects close to finalization Strategic Customer demand and pipeline replacement continue to drive investment in our existing gas distribution and transmission operations. PPC Callahan Pipeline (Florida) PPC Auburndale Pipeline (Florida) Guernsey Pipeline (Ohio) Filing for rate relief associated with Hurricane Michael: interim rates begin January 2020. Strong performance relative to our peers Access to competitively priced permanent capital Recent FERC filing to enable injection of RNG into Eastern Shore’s system. Commitment to continuous improvement in safety and operational compliance. 2019 first 9 months GAAP EPS of $2.59 represents 9.7 percent growth over 2018 Marlin and Ohl acquisition contributions Exited natural gas marketing business Gas distribution customer growth is well above the national average. Increased cross Business Unit collaboration is identifying operational synergies and efficiencies. Lower operating expense levels in 2019 and beyond. Dividend increased by 9.5 percent in May 2019; Five year dividend growth (CAGR) = 8.4 percent TCJA tax benefits have contributed to margins in our non-regulated and Florida regulated natural gas businesses. PPC and FPU Palm Beach County expansions (Florida) ESNG DelMar Pathway (Delmarva)


Slide 27

Financial Summary Income from Continuing and Discontinuing Operations (PESCO Impact) The increase in interest charges reflects our growth in capital investments in 2018 and 2019. The average interest rate as of September 30th was 3.58% on total debt.


Slide 28

Major Projects and Initiatives Increasing Shareholder Value by Continuously Seeking and Developing Projects and Initiatives $10.5 MM increase from new pipeline projects thru 9/30 - $12.5 MM increase expected for full year Recent acquisitions added $5.0MM thru 9/30 ($6.6MM projected for full year) $2.8 MM from regulatory initiatives thru 9/30 ($3.2 MM projected for 2019) We are continuing to pursue several projects that should add to our margin growth in 2020 and 2021. Further details will be forthcoming as these projects are finalized. Please note that this table does not reflect any final rate relief associated with Hurricane Michael.


Slide 29

Successful Regulatory Initiatives 29 Florida PSC approved retention of a portion of TCJA tax savings for the Company’s Florida natural gas operations: $1.3 million gain on reversal of 2018 tax reserves $2.4 million incremental benefit annually beginning in 2019 ($1.1 million in first nine months of 2019) Florida PSC approved storm recovery fund surcharge ($2.3 million to be recovered from April 2019 to March 2021) Two recent filings below with Florida PSC and FERC: Limited Electric Proceeding associated with Hurricane Michael Filed for recovery of storm-related costs associated with Hurricane Michael (capital and expenses) through a change in base rates Eastern Shore filing to include standards to accommodate renewable natural gas In response to interest from several renewable natural gas producers and given customer interest Also requested recovery of certain storm-related costs as regulatory assets Our team has reached a settlement with OPC followed by approval of the PSC on the structure of the recovery. We will begin implementing interim rates with the first billing cycle in January. The renewable natural gas quality specifications articulated below conform to the least stringent of the quality specifications contained in FERC gas tariffs of the upstream pipelines that interconnect with Eastern Shore’s system. Filed on October 16, 2019; FERC has 30-days to accept/reject/suspend or the filing is effective as proposed


Slide 30

Strategic Exit of Natural Gas Marketing Business (PESCO) Strategic Review The business was not aligned with our long term growth strategy; exceeded our risk tolerance and would have required significant additional investment to ensure profitability. Florida retail operations sold to Gas South LLC. Benefits Total of $15 million estimated proceeds plus working capital should be received in the fourth quarter of 201 9 Exiting the business improves our earnings outlook, reduces the volatility of future earnings and recovers our PESCO investment. Non-Florida retail operations/contracts sold to United Energy Trading, LLC (UET). Mid-Atlantic operations/contracts and asset management agreements were sold to NJR Energy Services Company (NJRES). Estimated pre-tax gain ranging from $5.0 million to $7.0 million to be recorded in the fourth quarter of 2019 PESCO now accounted for as a discontinued operation Remaining small producer services portfolio recently sold. We decided to exit the business, identified parties with interest and have substantially concluded the sale. Sale of Assets


Slide 31

Continuing to Build for the Future Organic Growth Opportunities, Supplemented with Targeted Acquisitions Five-Year Cap Ex Plan Historical Cap Ex & Acquisitions In Millions Our 5-year CapEx plan includes $750 million to $1 billion of capital expenditures, predominantly into our utility & pipeline businesses 2019E: $170mm to $185mm 2018: $283mm 2020 – 2022E: $297mm to $532mm $750 million - $1 billion On Track To Achieve Investment Forecast


Slide 32

Capital Projects – High Return / High Investment Peer ROE vs. Capital Expenditures (Three Year Performance - July 2016 – June 2019) 32 Chesapeake Utilities Three Year Performance vs. Peer Group As of 6/30/19 CPK Med 75th Cap EX 25.1% 11.8% 14.3% EPS Growth 1 0.1% 5.8% 8.5% ROE 11.6% 9.4% 10.9% Dividend Growth 9.9% 6.1% 7.2% TSR 14.8% 11.3% 12.7% Capital Expenditures/Total Capitalization


Slide 33

Capital Capacity to Support Future Growth Total Capitalization has More Than Doubled in Less Than Five Years 33 Equity/Permanent Capitalization 65.5% 70.6% 76.5% 71.1% 62.1% 59.2% Equity/Total Capitalization 54.0% 51.9% 55.4% 51.5% 45.4% 44.6% $556,148 $689,692 $805,010 $944,079 $1,220,865 Target Equity to Total Capitalization Ratio of 50% - 55% Excluding $60 million Hurricane Michael Notes Equity to Total Capitalization equals 47% $1,140,852 $260,390 * Short-term debt includes current portion of long-tem debt Financing Components (1) $370 million lines of credit through October 2020 (2) $60 million Intermediate Hurricane Michael Term Loans Refinanced: Long-term Private Placement of $70 million - at 2.98% To be funded December 20, 2019 Final maturity of December, 2034 (3) $375 million Long-term debt private placements are fixed rate notes, with equal annual amortization ten years before maturity (4) $250 million private placement shelf facilities available for additional financing needs (5) Chesapeake seeks to align permanent financing with the in-service dates of its capital projects


Slide 34

Commitment to Sustainability and ESG Corporate Governance is the foundation of our processes and decision making - Recently Honored by Corporate Secretary as “Governance Team of the Year” among small and mid-cap companies - Honored as “2018 Best North American Utility for Corporate Governance” Connecting with our Customers and Communities - Chesapeake Utilities recognizes that customers expect safe, efficient and reliable service , as well as providing enhanced business connection options, more convenience and modern solutions - In 2018 Chesapeake employees volunteered over 3,900 hours making personal connections and having a significant impact where we live, work and serve Employee-Centric company focused on sustaining our aspiring and caring culture - Eight years in row being recognized as a Top Workplace Combination of Strategic Focus, Engaged Employees and Innovation 34


Slide 35

Chesapeake Utilities Corporation Committed to Superior Performance We seek to identify and develop opportunities to drive our future earnings growth and increase shareholder value. Executing on Our Strategy: Seek development projects to serve new customers, provide new services and expand into new service areas. Investing in pipeline systems that provide natural gas service to downstream customers such as LDCs, cooperatives, municipalities, industrial end-users and power plants. Pursue expansion projects that serve long-term commercial and industrial customers. Investing in propane opportunities to access new markets with significant growth potential. Pursuing new platforms for growth given our Marlin investment (CNG, LNG, RNG) Engagement strategies with employees to continually build our strategic infrastructure for sustainable growth. Investing in our talent with targeted development plans and training Engaging with communities where we work and live Pursue brand excellence through safety awards, top workplace, employee engagement and community service


Slide 36

Thank You! Beth Cooper Executive Vice President, CFO and Asst. Secretary bcooper@chpk.com Any Questions? Thomas E. Mahn Vice President and Treasurer tmahn@chpk.com